EDSA Urban Design
EDSA
The EDSA Urban Design is a company study project that analyzed the adverse effect of traffic from the micro to the macro level. The study recommends a unified elevated walkway from North to South that can be integrated with the developments along EDSA. This aims to improve the mobility and transportation problems within Metro Manila and decongest EDSA from private vehicles. It also includes strengthening the walkability between cities, integrating access points between establishments, and creating a safer and more comfortable path for pedestrians and bikers.
COMPLETED - 2016